ACADEMICS

CONTACT

School of
Transportation,
2 Southeast University Road,
Jiangning District, Nanjing, Jiangsu Province
211189
P.R.China
Office: 025-52091255
dndxjtxy@126.com

Gao Chengfa


Gao Chengfa

Department of Surveying and Mapping Engineering, School ofTransportation, Southeast University

2 SipaiLou, Nanjing, Jiangsu, China

Phone (86) 25-83790102, Fax (86) 25-83790102

Email: gaochfa@seu.edu.cn; gaochfa@163.com


Gao Chengfa, male, born in November 1963 inHai’an, Jiangsu Province, holds a doctoral degree of engineering. At present,he is a Professor, doctor Supervisor, and Secretary in the Department ofSurveying and Mapping Engineering of the School of Transportation, and Directorof the Institute of Surveying and Mapping Engineering in the SoutheastUniversity. He also holds concurrent posts as council member of the Branch ofEngineering Surveying of the Chinese Society of Surveying and Mapping, VicePresident and Secretary of the National Institute of Traffic EngineeringSurvey, council member of the Education Board of Management of Chinese GPSAssociation, member of the International CPGPS. He studied and worked at theUniversity of Calgary in Canada in 2005 and at Hong Kong Polytechnic Universityin 2008. For more than twenty years, he has been engaged in the research on thetechnology and applications of GNSS with a focus on GNSS Precise PointPositioning and Network RTK. Besides being an author/co-author of 5 coursematerials and academic monographs, he has also published over 80 journal andconference papers, obtained 4 national invention patents, and achieved numbersof academic and teaching awards, including 4 awards of provincial-level. Inrecent years, he has directed and completed more than 30 national andprovincial research projects. In particular, great achievements have been madein the field of application of GPS in traffic engineering and territorialresources surveying. He is an outstanding scholar with strong organization andmanagement skills, and with excellent capacity for scientific research.

EducationBackground:

April2000-Present: Deputy Secretary, School of Transportation, Southeast University,Nanjing, China.

[Servedas Department Secretary and Institute Director of Surveying and MappingEngineering at the same time.]

During this period:

August2008-December 2008: Working Professor, Hong Kong Polytechnic University,Hong Kong, China.

August2005-January 2006: Senior Visiting Scholar, University of Calgary, Canada.

September2001- September 2004: Ph.D., Workplace Learning, Southeast University.

May1993-April 2000: Surveying GroupDirector, Department Secretary and DeputyDirector, Port and Waterway Engineering, NanjingTransportation College, Nanjing, China.

August1987-May 1993: Lecturer, Engineering Surveying Group, HarbinMetallurgical Measuring College, Harbin, China.

Duringthis period:

September 1989-May 1992: M.Sc., 891 class, WuhanTechnological University of Surveying and Mapping (Wuhan University).

September 1983-June 1987: B.Sc., Engineering Surveying831class, Central South University of Technology(Central South University).

Publications

Books and Contributions to Books

[1]Gao C., Hu W. The Principle and Application of Satellite Navigation and Positioning.China Communication Press, Beijing.2011.09.

[2] Hu W., Gao C. The Principle andApplication of GPS Surveying. China Communication Press, Beijing. 2002.10.

[3]He Y., Gao C. Engineering Surveying. China Communication Press, Beijing.2006.12.

[4]Zhou l., Gao C. Digital Surveying and Mapping Technology and Traffic Construction. Xi'anMap Press.2005.04.

[5]Gao C. GPSSurveying. China Communication Press, Beijing.1999.10.

Refereed Journal Papersand Conference Papers

[6]Gao C., Gao W., et al. Reference satellite selection methodfor CORS rover station based on condition number. Journal of SoutheastUniversity: Natural Science Edition, 2014,44 (5): 941-945.EI.

[7]Gao C., Gao W., et al. Research and testing of GPS Real-timeprecise point positioning. Journal of Southeast University: Natural ScienceEdition, 2013,43 (S2):230-234.EI.

[8]Gao C., Shen X., et al. Precise clock error estimation ofGPS satellite based on regional reference network. Journal of Navigation andPositioning,2013,1 (1), 40-46.

[9]Gao C., Shen X. Algorithm for VRS Based on Star Structure. Applied Mechanics andMaterials, 2011 (4). EI.

[10]Gao C., Wu F.An Improved Weight StochasticModel in GPS Precise Point PositioningInternational Conference on Transportation and Mechanical &Electrical Engineering(TMEE2011Changchun,China), 2011.EI.

[11]GaoC.,Yan B. Algorithm and implementation ofGPS/VRS network RTK.2nd International Conference on Earth Observation forGlobal Changes 2009.EI.

[12]GaoC. Determination of RequiredObservation Time in the Field for GPS Control Surveys. International Symposiumon GPS/GNSS, Hongkong, 2005.12.

[13]GaoC.,Wan D. Establishing Highroad SurveyFramework Using GPS. 2002 International Symposium on GPS/GNSS, Wuhan, China.C6-6, 33.

[14]GaoC.,Xie Y. The Comparative Analysis of PointPositioning Using Carrier Phase Smoothed Pseudorange with Various Ephemeris.Modern Surveying and Mapping, 2010. 11,33(6),3-8.

[15]Gao C., Wan D. Restricting GPS Integer Ambiguity by Improved LAMBDA Algorithm. Geomaticsand Information Science of Wuhan University, 2006.8,31(8): 744-747.EI.

[16]Gao C., Chen A. Test and analysis for precision of GPS precise point positioning. Journalof Chinese Inertial Technology, 2006.12,14 (6):23-28.

[17] Gao C., Wan D. Research on Coordinate Solution Model of GPS Post Differenceand Correlated Problems. Acta Geodaetica et Cartographica Sinica, 2006.6,35(2):148.

[19] Gao C., Liang T. Application of Differential GPS Bathymetric SurveySystem for Channel General Survey. Port & Waterway Engineering,2003.12,12:50-52.

[20] Gao C., Wan D. The weight determination of the double difference observationin GPS carrier phase positioning. Science of Surveying and Mapping, 2005.6,30(3): 28-32.

[21] Gao C., Wan D. Establishing GPS Highway Survey Framework. Journal of Highwayand Transportation Research and Development. 2003.12, 20 (6): 1-4.EI.

[22] Gao C., Zhao Y. Application of DGPS water depth measuring system in harborproject. Engineering of Surveying and Mapping, 2004.9, 13 (3): 16-19.

[23]Gao C. GPSOffset Observation of Engineering Framework Using Coordinate Transfer. Journalof Southeast University (Natural Science Edition), 2001.1, 31 (1): 83-86.

[24]Gao C. AdjustmentOptimization Treatment of GPS Highroad Survey Framework. Journal of SoutheastUniversity (Natural Science Edition), 2001.5, 31 (3): 90-93.

[25]Gao C., Qi H. Reflections in Modern multi-functional GPS measurements teaching practicefield construction. Mapping of Higher Education Teaching.2005.12.

[26]Gao C.The Investigate in determination of the solar zenith distance astronomicalazimuth accuracy. Jiangsu Surveying, 1995.02, 19-22.

[27]Gao C. Computingthe Center Line Coordinate in the Construction Coordinate System. NortheastSurveying and Mapping, 1998.02, 14-16.

[28]Gao C., Cai N. The basic idea of the Port and Waterway Engineering Teaching Reform.Educational Research, 1998.03: 31-32.

[29]Gao C., Chen Y. A kind of GPS fast precision positioning method. Surveying and Mapping,1993.09, 2 (3): 7-10.

[30]Gao W.,Gao C. The GAMIT baseline-solution method based onbroadcast ephemeris and precision analysis. Engineering of Surveying and Mapping, 2014,238: 54-57.

[31]Gu P.,Gao C. The research and design bus route of points ofInterest query system based on GIS. Modern Surveying and Mapping, 2014,37 (5: 25-28.

[32]Gao W.,Gao C.,et al. Precise clock estimation ofsatellites based on regional reference stations and its application on real-time PPP.Journal of Southeast University (Natural Science Edition), 2013,43 (S2): 400-405.EI.

[33]Xia Y.,Gao C.,et al.Determination ofreal-time precise satellite clock offset based on multiple reference stationsusing regional CORS.Journal of Southeast University (Natural ScienceEdition), 2013,43 (S2): 433-439.EI.

[34]Chen W.,Gao C.,et al. Improved PPP resolution consideringregional CORS based tropospheric information. Journal of Southeast University(Natural Science Edition), 2013,43(S2): 370-374.EI.

[35]He F., Gao C., et al. Precision analysis of predictedorbit on IGU real- time precise ephemeris. Journal of Southeast University(Natural Science Edition), 2013,43(S2): 384-387.EI.

[36]Wang D., Gao C., et al. Extraction of ionospheric TEC andapplication in single frequency PPP based on regional CORS. Journal of SoutheastUniversity (Natural Science Edition),2013,43 (S2): 388-393.EI.

[37]Zhu H., Wu X., Gao C.Research of modeland precise timing based on precise point positioning in GPS system.Journal of Southeast University (Natural Science Edition), 2013,43 (S2): 423-427.EI.

[38]Shi X., Sheng R., Gao C.Dynamicrelative positioning of GPS /BDS based on wide lane ambiguity. Journal of SoutheastUniversity (Natural Science Edition),2013,43 (S2): 446-450.EI.

[39]Hu W.,Nie W., Gao C.Real-time monitoring of regional ionospheric TEC based on CORS with grid technology. Journal of SoutheastUniversity (Natural Science Edition),2013,43 (S2): 219-224.EI.

[40]Wang D., Gao C.Extractionand application of un-differenced atmospheric delays with un-combined precisepoint positioning technique. China Satellite Navigation Conference, CSNC 2014,Lecture Notes in Electrical Engineering, v 304 LNEE, n VOL. 2, p 399-413,2014.EI.

[41]Gao W., Gao C.Ill-posednessanalysis of ambiguity resolution using BDS-2 and its fusion with GPS. ChinaSatellite Navigation Conference, CSNC 2014, Lecture Notes in ElectricalEngineering, v 304 LNEE, n VOL. 2, p 387-398,2014.EI.

[42]Chen W.Gao C. Assessmentof GPT2 empirical troposphere model and application analysis in precise pointpositioning. China Satellite Navigation Confer -ence, CSNC 2014, Lecture Notesin Electrical Engineering, v 304 LNEE, n VOL. 2, p 414-420,2014.EI.

[43]He F., Gao C. Application of robust Helmert varianceestimation in GPS/BDS/GLONASS integrated positioning. Journal of Navigation andPositioning, 2013.9, 1 (3).

[44]Shi X.,Gao C. Accuracy analysis of GPS real-time servicedata. Journal of Navigation and Positioning, 2013.9, 1 (4).

[45]Gao W.,Gao C.The analysis of ill posedness inGNSS high-precision differential positioning. China Satellite NavigationConference, CSNC 2013, Electrical Engineering, v 244 LNEE, p311-321, 2013.EI.

[46]Wang D.,Gao C.Single-epoch integer ambiguityresolution for long -baseline RTK with ionosphere and troposphere estimation.China Satellite Navigation Conference, CSNC 2013, ElectricalEngineering, v 243 LNEE, p125- 137, 2013.EI.

[47]Shen X.,Gao C. Algorithm for Network RTK (VRS) Based on Star Structure. Acta Geodaeticaet Cartographica Sinica,2012.2,41(41):33-40.EI.

[48]Shen X.,Gao C. An approach for ambiguity resolution based on improved sequentialadjustment suitable for medium-long baseline. Science of Surveying and Mapping,2012.3,37 (2).

[49] Zhao C., Gao C. Analysis of selection rules of wavelet threshold ingravitational abnormal data processing. Journal of Southeast University(Natural Science Edition), 2005.9,35 (5): 820-823.EI.

[50] Jiang J., Gao C. (2005) Utilizing BP network to forecast theshortest time of GPS survey. Science of Surveying and Mapping, 2005.12, 30 (6):90-91.

[51] Zhao Y., Gao C. The Format Change from CMC Data Generated by GPS Receiver toRINEX Data. Journal of Highway and Transportation Research and Development,2004.6,21 (6): 113-116.

[52] Wang W., Gao C. Wide-lane Ambiguity Resolution of Network RTK Based onImproved Carrier Phase Smoothed Pseudorange. Bulletin of Surveying and Mapping,2012.04, 41-46.

[53] Shen X., Gao C. Research on GPS elevation abnormal fitting based on leastsquares collocation method and BP neural network. Engineering of Surveying andMapping, 2011.8, 20 (4): 14-21.

[54] Sheng R., Gao C. A Comparative Study and Experimental Analysis ofNetwork RTK & PPP Positioning Model. Bulletin of Surveying and Mapping,2010.5, 1-5.

[55] Yuan B., Gao C. Realization of cycle slip detection and correction using GPScombined observations. Science of Surveying and Mapping, 2008, 10,33(Suppl).87-88.

[56] Yuan B., Gao C. Research on the differential correction generation approachfor GPS/VRS technique. Engineering of Surveying and Mapping, 2009.10, 18 (5):27-30.

[57] Yuan B., Gao C. Software Design and Implementation of GPS Baseline Processingand Network Adjustment. Surveying and Mapping, 2009.02, 32(1):3-7.

[58] Zhu C., Gao C. Algorithm for generation of GPS virtual phase observationbased on VRS. Journal of Geodesy and Geodynmics, 2009.02, 29 (1): 123-126.

[59] Zhao C., Gao C. Research on methods of alleviating error of vibrating-beamgravitational sensor. Science of Surveying and Mapping, 2008.11, 33 (6): 63-65.

[60] Xu D., Gao C. Apply Delaunay triangulate networks to construction of vastCORS fiducial stations network. Science of Surveying and Mapping. 2008, 10, 33(Suppl). 265-267.

[61] Cao X., Gao C. Factors Analyze of The Convergence Rate For Precise PointPositioning. Modern Surveying and Mapping, 2007.01,30 (1): 19-21.

[62] Cao X., Gao C. Choosing satellite of GDOP in GPS Precise point positioning.China High Technology Enterprises, 2007.04, 65-67.

[63] Peng H., Gao C. The Virtualization and Precision Analysis ofArtificial Code Observation of GPS Based on VRS. Bulletin of Surveying andMapping,2007.06, 1-4.

[64] He Y., Gao C. Research on engineering surveying teaching of constructionclass project management specialized. ENGINEERING OF SURVEYING AND MAPPING,2007.10, 16 (5): 71-74.

[65]Zhu C., Gao C. Application of WalkField Software in Underwater Topographic Surveying andMapping. Hydrographic surveying and Charting, 2008.5,28 (3): 65-67

[66] Chen C., Gao C. The Algorithm Implementation of Standardization of Orbits ofGPS Satellites. Modern Surveying and Mapping, 2008.05, 31 (3): 3-5.

[67] Feng B., Gao C. Problems Relating to High Precise Point Positioning of GPSUsing p3 Software. Journal of Geomatics Science and Technology, 2008.08,25(4):249-251.

[68] Sheng R., Gao C. Influence of Coordinate Error on Estimated Parameters.Port Technology Dynamic, 2005.10, 20-21.

[69]Xia D., Gao C. Developmentand Application of Onboard GPS in Vehicle Monitoring Dispatching System.Journal of Geomatics Science and Technology, 2004.6, 21 (6): 109-112.

[70] Chen X., Gao C. A Simple Method of Road Curve Segment Line and PointCoordinate Calculation of Slope Excavation. Jiangsu Surveying and Mapping,2002, S1:144-145.

[71] Li Y., Gao C. The Brief Introduction on BEIDOU Satellite Navigation andPositing system. Jiangsu Surveying and Mapping, 2001.12, 10-11.

Projects

1National Key TechnologyR&D Program of China during the 12th Five-Year Plan Period(2012BAJ23B01) (2012-2015): “Development of GNSS Ground-based Augmentation System Usedin Rural Land Survey and Monitoring Techniques”, Sub-Project Leader.

2.Ministry of Land Special Fund in the Public Interest (201211001-08)(2012-2014): “Technology Research on the Integration of Multi-source and Multi-scaleLand Use Information”, Project Leader.

3. Changjiang Nanjing Waterway Bureau (2014-2015): Main Projectof Chou-linji BDS/GPS combined Beacon Station”, Project Leader.

4.Ministry of Land and Resources, Beijing Municipal Bureau of Land and Resources(7622005536) (2008-2009): “Large-scale Application of Survey Techniques in the Statusof Rural Land Use”, Project Leader.

5.National Key Technology R&D Program of China during the 11thFive-Year Plan Period (2006BAJ15B03) (2006-2010): “Demonstration Project of KeyTechnology in the city Municipal Infrastructure Management and OperationsPlatform”, Sub-Project Leader.

6. Changjiang Nanjing Waterway Bureau (2014): “Researchon Yangtze River Hydrographic Surveying without Tidal Observationin Anhui Province”,Project Leader.

7. Changjiang Nanjing Waterway Bureau (2013): “Researchon Yangtze RiverHydrographic Surveying without Tidal Observation in JiangsuProvince”,Project Leader.

8.Waterway Bureau of Guangdong Province (7621005083) (2005.3-2006.8): “Channel ControlMeasurement Program (Design) in Guangdong Province”, Project Leader.

9. Ministry of Land and Resources (6722001001) (2002-2004): “Research and Developmenton the Collection and Processing System of Land Change Information Based onGPS-PDA”, Second Project Leader.

10. Southeast University Research Fund (9221001077) (2000.12-2002.12): “The Application ofDifferential GPS in Inland Waterways Project”, Project Leader.

11. Ministry of Land and Resources (6422001130) (2003.08-2003.12): “Technology Systems ofLand Use Change Survey based on GPS and GIS”, Third Project Leader.

12. Construction Headquarter of Nanjing Port (8521002080) (2000-2012): “GPS Control Survey andTopographic Survey of Long-tan Port in Nanjing”, Project Leader.

13. Administrative Committee of Lishui Development Zone in Nanjing(8521002214) (2003.5-2004.12): “Aero Photogrammetry of LishuiDevelopment Zone in Nanjing”, Project Leader.

14. Yancheng Waterway Management Office (852100121) (2003.1-2004.12): “The Census TechnicalSupport of Yancheng Waterways”, Project Leader.

15. Suzhou Waterway Management Office (8521001216) (2003.1-2004.2): “GPS Control Survey ofSuzhou Inland Waterways”, Project Leader.

16. Long-tan Logistics Ltd in Nanjing (8521002234) (2003.8-2006.8): “Topographic Survey ofLong-tan Logistics Park in Nanjing”, Project Leader.

17. Nanjing Port Co., Ltd, (8521002266) (2003.11-2005.11): “Underwater TopographicSurvey of Nanjing Port”, Project Leader.

Awards

1. 2014 Science & Technology Development Second Prize (3/10): Key Technology and System Application of High Precision Ground Based Satellite Positioning, awarded by the Ministry of Education.

2.2012Ministry of Land Science and Technology Second Prize (3/10): Independent CORSSystem Development and Application in Land Survey Monitoring, awarded by theMinistry of Land and Resources.

3.2011Jiangsu Surveying Technology Progress First Prize (5/10): GNSS NetworkDifferential Technology and its Application, awarded by Jiangsu Science andTechnology Association.

4.2011Outstanding Paper Award Prize (1/5): Research of GPS Precise Point Positioningsingle differential observation stochastic model, awarded by the ChineseSociety for Surveying Mapping and Geoinformation, Branch of EngineeringMeasurement.

5.2011Outstanding Paper Award Prize (1/2): Establishment of GPS highway survey mastercontrol network, Branch of Engineering Measurement, awarded by the ChineseSociety for Surveying Mapping and Geoinformation.

6. 2005 National College of Surveying and Mapping OutstandingTeaching Third Prize (2/5): GPS principles and applications, awarded by theNational Administration of Surveying Mapping and Geoinformation.

7.2003 Jiangsu CollegeOutstanding Teaching Course Second Prize (3/5): Surveying Course Construction,awarded by the Education Department of Jiangsu Province.

8. 2013 Jiangsu Outstanding Master’s ThesisPrize (Shen Xuefeng): Key Algorithm of Network RTK Based on Star Topology andResearch on Real-time Precise Clock Error, Tutor.

9. 2010-2011 Chang Duan Research grants, awarded by Thepeople's Government of Changzhou City.

10. 2002-2003 Chang Duan Research grants, awarded by The people'sGovernment of Changzhou City.

11. 2011 Outstanding communist party member, awarded by SoutheastUniversity.

12. 1998 Excellent educational worker, awarded by NanjingTransportation College.

13.2010Certificate for national patent (201010579334.0) (1/5): Precise PointPositioning Based on a combination of inter-satellite difference method.

14. 2011 Certificate for national patent (201110137961.3) (1/5): AMethods Improved the Accuracy and Convergence Rate of Satellites Precise PointPositioning.

15. 2014 Certificate for national patent(2014120301138170.0) (1/5): A Method based on beacon Real-time DifferentialPositioning.

Teaching Summary

1.MSc Course Director for SpaceSatellite Positioning Technology.

2.BSc Course Director for Principle andApplication of GPS Surveying.